Building Safety Signs and Egress Markings According to the IBC and IFC

When we see a news story about people who lost their lives trying to escape from a large commercial or residential building that was on fire, we typically assume that the fire progressed to the point where evacuees didn’t have viable escape options. But the truth behind many fatal building fires is that building occupants did have time to evacuate the building; they just didn’t have an efficient means of doing it. When a large commercial or residential R1 building catches fire, it occupants are instantly limited to seeking escape through its vertical exit enclosures and exit passageways, and the egress safety components with those enclosures and passageways play a large part in whether an evacuation goes smoothly or results in casualties. So, what kind of enclosures and passageways are prone to danger in the event of fire?

To answer this question, it helps to begin by describing what is typically considered sufficient emergency preparedness in the event of a fire. For many building owners, having a well-rehearsed evacuation plan in place and having exit stairwells that are equipped with emergency backup lighting qualifies as emergency preparedness. But there are two problems with this scenario. For one, emergency back up lighting does not perform well in the presence of smoke; instead of illuminating stairwells as it would in the event of a simple power outage, its lamps become like headlights in the fog, which leads us to the second problem. As evacuees rush into stairwells and lose their visual bearings, an evacuation plan can easily turn into a stampede where people die from the evacuation and not the fire.

To prevent this situation from happening, responsible building owners improve upon the evacuation safety offered by an evacuation plan and emergency backup lighting by implementing luminous fire safety signs and egress markings in accordance with the International Building Code (IBC) and the International Fire Code (IFC). The IBC applies to new construction and has been adopted by all 50 states; the IFC applies to both new construction and existing buildings and has been adopted by at least 42 states. In states that have adopted the codes, all commercial and residential R1 buildings that contain occupancy at above 75 feet from the lowest level of fire department vehicle access are legally bound to IBC and IFC guidelines.

If you own a large commercial or residential building in a state that has not adopted a version of the IFC, implementing IFC recommendations for building safety signs and egress markings is still key to ensuring the safety of your building occupants, as well as protecting your self from the bad press and legal action that can result when evacuations don’t go as planned. Furthermore, implementing the code’s egress system guidelines is simple and economical. In addition to purchasing inexpensive photoluminescent safety signs for each level of an exit enclosure, building owners need only purchase luminous egress markings in the form of photoluminescent tape and apply it to the following egress components according to IFC guidelines: handrails and handrail extensions, stair edges, landing edges, obstacles, doorframes, door hardware and floor areas.

Be the first to comment - What do you think?
Posted by Builder - May 18, 2012 at 4:56 pm

Categories: Uncategorized   Tags: , , , , ,

The Details of the 2008 California Building Code Changes

The 2007 California Building Codes took effect January 1st, 2008. Some of the more prominent areas of change in this installment of building codes center on fire safety, equal access for disabled persons and environmentally friendly construction. The new set of codes is based on the latest national and international model building codes.

Rosario Marin, Secretary of the State and Consumer Services Agency and chair of the Building Standards Commission has said, “This will put California back in the forefront as a leader in the use of the latest technology for building safety, fire prevention, safe construction, and code enforcement.”

With California’s 2006 global warming law mandating a cut in carbon emissions to 1990 levels by 2020, the pressure is on to change the way we build. Some California cities, such as Los Angeles, are taking the changes to heart. Los Angeles is doing its part by adopting new building plans that require large new developments to be 15% more energy efficient than in previous years.

California State Fire Marshall, Rueben Grijalva pushed for many of the changes to the 2007 Building Codes in response to the devastation resulting from recent wildfires in the state. The new 2007 California Building Code changes include additional wild land-urban interface fire protection standards for vulnerable structures located in areas prone to wildfires.

However, the new changes are being met with some resistance related to the drastic cost increase required to meet the new codes. One of the proposed changes requires two-hour fire resistant floor ratings for buildings larger than three stories and two-hour fire resistant construction that extend to supporting structural elements to grade. This change affects the cost of a new construction building by adding $6 per square foot, and $250 per square foot for an existing structure.

Compliance with this code requires additional:

oFire proofing materials

oShaft construction

oLengthier penetration protection

oDesign Fees

oPermit and inspection Fees

oAdditional sprinkler heads

Additional code changes include the approval of Chlorinated Polyvinyl Chloride (CPVC) plastic pipe for use in residential water supply systems. Also introduced, is the federal Department of Justice (DOJ) certification requirements for barrier-free entryways for persons with disabilities.

Additional Changes For Residential Buildings:

owood siding and wood-shake roofs are banned in fire-prone areas

oshortened staircases with wider steps

olandscaping near the home must be free of trees, shrubbery, and other fire-fuel sources

olowered heating requirements to 68° F at three feet above the floor

oonly one exit on third story required, regardless of square footage

ominimum kitchen floor area is now 50 square feet with a minimum clearance of 3′ between counters and walls and appliances

ohigher guardrails for stairs

oMinimum attic access opening reduced to 20″ x 30″

owall between garage and living space may now use ½” type-x drywall instead of 5/8″

oreduced size of emergency egress window for grade floor openings

oMinimum clear width for doors clarified as 32″ with a height of 80″

ospiral stairs may be used as a second exit regardless of the size of the home

oreduced light requirements to 8% of the floor space

omechanical ventilation now permitted in place of natural ventilation

ofive foot required minimum distance for un-rated walls and unprotected openings from property line

Notable Changes for Commercial Buildings:

oallowable provisions of them all the story would frame building are less restrictive

owood frame buildings can now be constructed up to 70 feet and height and up to four stories

osprinklers can now be used for both height an area increases and can be used in lieu of rated corridors is the building is equipped with a sprinkler system throughout

Structures in compliance with the 2007 California Building Codes will receive reduced insurance rates and higher resale values, but those promises do little to allay the pressure of additional up-front construction costs.

Be the first to comment - What do you think?
Posted by Builder - May 18, 2012 at 1:29 pm

Categories: Uncategorized   Tags: , , ,

How to Choose the Building Contractor That’s Right For You and Not Get Burned in the Process

Choosing a contractor to build your home is vital stride in making your dream home a reality. There are a lot of factors to consider when making your choice and a few missteps that can be avoided with a little research.

Step #1:

Knowing what your contractor will do for you.

When construction commences your contractor will manage, arrange and handle all aspects of the process. Working off your floor plans they first provide you with pricing, obtained from their various trades, and then acquire any permits & engineering documents necessary for construction in your local area. They arrange for materials to be delivered to your site and manage all the various trades’ people (excavation, carpenters, electricians, plumbers, drywall installers, etc.) that will work on your home so that they arrive when needed and conclude their jobs proficiently and according to the schedule needed to meet the possession date you have set. Quite the responsibility when you think about it, but many contractors can manage a large number of projects along with yours and never see a single hiccup in the process.

Step #2:

Finding the Contractor who is right for you.

While these days you certainly CAN find a contractor on the web or in your phone book, a better place to start is often with friends, family or neighbors; their personal experiences with contractors can be invaluable in the selection process. Did the contractor they used live up to his promises and deliver what was agreed to? Were there problems with the construction and how they were resolved? Most importantly was the contractor honest with them about his schedule and his costs? Often you can find just the right person simply by asking around.

If you don’t have that personal reference then checking with your provincial or local home builders’ associations is often a good place to start. These associations register builders and hold them to a code of conduct, while ensuring that they have available to them resources such as training for building code changes and information on new products and their applications.

Your local chamber of commerce or better business bureau can often point you in the direction of builders with a good reputation in their community. Builders who are registered with the Chamber are monitored and problems with them can go onto a permanent report, so they are often very careful and willing to work with you should a problem arise.

If you have the chance, go to your local home show prior to making your selection. Often builders will be present with displays of some of their previous projects. You can research building materials while also getting an opportunity to meet with several contractors all in the same place.

Step #3:

Narrowing down the list

Whether the search has brought you one or twelve contractors with good references you still need to meet with them and ensure that this will be the right fit for you. You’re going to want to interview whomever you have short listed and see if they are up to standard to manage your project. We suggest having a series of questions listed to ask each contractor so you can evaluate their responses on similar issues.

How long have they been in business and what experiences do they have that will apply to your project?

Will they perform the work within their company or will they subcontract the project?

What kinds of insurance will they carry on your project? This issue is often something you should familiarize yourself with in advance. Your mortgage lender will most likely have requirements for what types and amounts of insurance will be required and your builder will be required to provide proof of insurance before the mortgage lender will issue funds.

Can they provide you with a sample of the contract documents you will be signing?

If you already own a property what suggestions do they have about the land and what issues can they foresee with regards to construction? Issues arising from soil and lot grading can single-handedly drive your project over budget if not properly accounted for in advance. Does the contractor feel that any additional engineering will be required due to soil conditions or grading?

What makes this contractor unique compared with his competition? Does he build in an energy efficient manner? Can you see an example of the quality of the finish inside one of his previous projects? These sorts of questions will tell you whether this builder is competent enough to handle the responsibility you are going to hand him.

This is also an opportunity for you to get a feel for what the relationship will be like between you and your builder, after all this business is about building more than houses. You need to feel comfortable interacting with your builder as you will likely be seeing a lot of them in the coming months. If you have a property already then you should take each contractor out to the site and walk it with them. Discuss the design and how it should situate on the lot.

Be sure to interview and receive bids from at least three contractors. You’ll never know what you might have missed if you don’t shop around.

Most importantly of all, make sure you are clear about everything that the contractor tells you. Miscommunication is the most common way for errors to take place in the construction process so make sure from the beginning that the contractors clarifies anything you have ANY trouble understanding. That’s their job. You need to understand what you’ll be purchasing from them, when you need to have made decisions about the house, and what is going to be charged to you right off the bat.

…and when all of your interviewing is done you need to make your final decision. Bear in mind these three summary points when making your final choice.

1. Did I feel comfortable that they were competent?

2. Did I feel confident that they were trustworthy?

3. Did I feel confident that they understood what I need?

Unless the answers to all of those points are yes you should really consider shopping around some more.

Step #4:

Write it all out

Contracts are invaluable in the construction business. Written, clear and concise, these documents can save any project from a thousand, million different pit falls that can arise through the course of a project. Certainly if you feel comfortable with a contractor the verbal agreement he/she proposes might seem like a reasonable agreement. However, the construction of a home takes months of time to complete and who is to say that what appears to be a good relationship at this point will be the same at the end of that process. Therefore a contract is always a prudent way to outline what the responsibilities of the contractor will be. It defines all of their involvement and their responsibilities and also outlines what you, the client, will be responsible for. It defines the cost of the project, including the builder’s fees and all taxes and should show a schedule of when funds will need to be passed over to the contractor from you, and the method you will pay in. There will likely be clauses outlining what the materials of construction will be and how they will be disposed of and at whose cost. Also there will be a section outlining schedules and what your possession date will be scheduled to be. Some contracts will ask for penalties and bonus scenarios depending on if the contractor is early or late for the possession date.

The likelihood is that your contractor will have developed a standard contract form and amendments can be made to that to incorporate any special requirements and terms that you agree on in negotiation. You will need to involve a lawyer to review the contract and you will need to read the contract carefully before signing. You and your contractor should both sign the contract and you should both have a copy.

As mentioned if your project is likely to take a period of months to complete then the contract will include the payment schedule for when you will to submit funds. These installments or “Draws” will be based on the completion of stages of the construction. It is always wise to have a walk through of the property and inspect the process of construction prior to each installment being issued and contractors will often schedule these walk throughs as a part of their process. If you see things which are deficient during the course of the walk through you will have the chance to see them corrected before the next draw is passed on. However, the full value of the contract is not paid out immediately on completion of construction. For most projects 10% of the total value of the contract should be held back until 45 days after completion to protect you against unpaid bills on the part of the contractor. This hold back process is a legal requirement in many areas and the contractor has no right to pressure you to pay out this final amount before it is due.

Contractors who have not received compensation have the option to place a lien on your property to ensure that they receive the payment that they are due. Should this occur, and if you have already paid out the full amount to the contractor, you would be responsible for the outstanding balance legally, so it is always a good idea to make certain that you are safe to proceed before making your final payment. You should consult your local authority to see what the period is after a trade completes their work before they can no longer place a lien and act according to that timeline. Also, as you may not receive notice that a lien has been filed right away you should check with the title registry office in your area to make certain that no liens are on your title before you pay out the hold back amount.

Alterations can be made to the contract through the process of construction; these are often called addendums or amendments. These will give you the freedom to change your mind about certain details of the construction. Often these adendums will require an additional fee depending on the stage of construction and what work will be required to make the change, but it means that you have the option to make changes if you should wish to.

Be the first to comment - What do you think?
Posted by Builder - May 18, 2012 at 9:25 am

Categories: Uncategorized   Tags: , , , , , ,

Wood Pole Buildings Versus Conventional Wood Frame Buildings for Cost of Construction

Across the United States, in most local building departments, there are building codes for prescriptive methods on how to build a conventional style home. In other words, stud wall construction. Most states have adopted the International Building Code, also called the IBC (by the International Code Council, the ICC), as their state code. Some counties and cities within those states may adopt their own codes if they feel that it is necessary to do so, or make amendments to the IBC as necessary to fit their geographic region.

With that said, the IBC code has prescriptive methods for how foundations are to be built, walls are to be constructed, how roofs are to be installed, etc. These prescriptive methods are represented in what is called the International Residential Code, or the IRC.

Prescriptive means a generally prescribed way to do something, that works in most circumstances and in most situations. It’s kind of a, “one size fits most” method. Kind of like a baseball cap with an adjustable strap. It fits big heads, small heads, medium heads, and square heads, cone heads – you get the picture.

Well, those prescriptive methods are conservative and can be considered over-built in many situations. In fact, most conventional wood frame buildings utilize only 40% to 50% of the design strength that they are designed to handle. Which means you invested 50% to 60% more money in wood that you really didn’t need. And we all know that we don’t have money to blow.

Because conventional wood frame buildings only utilize about half of their design strength, much of the building’s design strength is considered waste and is never realized, causing the building to be more expensive than a Pole Building design.

Pole Buildings, however, are generally engineered to utilize about 90% of their design strength. Which means less material wasted, which means less money wasted.

Many times than not, a pole building can be built for much less money than a standard conventional stud wall structure. Pole buildings are common for horse barns, large garages, storage facilities, and similar structures – even commercial buildings and becoming more common for homes. These types of structures are also very adaptable to large open spaces on the interior, with walls on the exterior to protect from the elements.

With that said, however, there are no prescriptive methods for designing wood pole buildings (or wood pole barns). The International Residential Code does not cover such buildings in the code manual. Which means, these types of buildings must be designed and analyzed by civil and/or structural engineers to withstand the elements (snow, wind, earthquake, soil, etc.). This is why an engineered pole building will normally utilize about 90% of their design strength vs 40 to 50% of a prescriptive stud wall design. Because they’re engineered — the engineer analyzes each and every element and optimizes the strength of that element so that there is no “waste”.

Be the first to comment - What do you think?
Posted by Builder - May 18, 2012 at 6:07 am

Categories: Uncategorized   Tags: , , , ,

How To Build a Shed – 3 Things You Must Know Before Building Your Shed

There are many great reasons for learning how to build your own shed. Perhaps you got married and your wife took over your garage and you just want some room back! Whatever your reason is for wanting a shed, building it yourself can be much cheaper than buying a store bought one. The store bought ones are usually made of cheap tin, require assembly and can cost hundreds to thousands of dollars!

Cost

The first thing you should consider is cost. This is ultimately what will determine how big of a shed you can build. Walk around your local home improvement store and get an idea of what lumber is costing. When you figure up all of your costs needed to build your own shed you should probably double it to get an accurate number. In my experience you can build an 8×8 shed for around $500 or so. Your’s could be less or more depending on how elaborate you get.

Permits

The second thing you need to check into is permits. This is often an overlooked part of building your own shed. Sometimes, you don’t need a permit at all for building a shed. Other times you need a permit once you exceed a certain size. Definitely check with your local building code enforcement on what the laws are. The last thing you want to do is have a pissed off neighbor rat you out and have the building inspector force you to tear down your shed!

Foundation

Once you get your budget together and know what size of shed you’re going to build, it’s time to lay the foundation. You can do this a couple different ways. A) Pour a solid foundation of concrete and build your framing up from there. Or B) Build 4 to 5 footers of concrete using a post hole digger and then build a floor on top of that using pressure treated wood. In my opinion a solid concrete foundation is the way to go – but the choice is completely up to you.

Well, now you have a good idea of the very basics to consider when learning how to build a shed.

Be the first to comment - What do you think?
Posted by Builder - May 18, 2012 at 2:32 am

Categories: Uncategorized   Tags: , , ,

Building a Four Season Sunroom

Having a four season sunroom can be a great investment for a variety of reasons. After all, in the winter it is far too cold to spend time outdoors and during the summer it’s either too hot or there are too many bugs around making it difficult to spend time outdoors. So, it can be a great idea to build your own sunroom that will provide you with comfort and relaxation all year round. However, if you are going to build a sunroom that can be used all year long, you are going to have to take many things into consideration.

Look for Companies That Offer Guarantees

When you are shopping around looking for a great company to install your four season sunroom, you’ll definitely want to go with a company that offers great guarantee. Make sure that they stand behind their products, but they should also stand behind installation as well. This is important and you’ll also want to go with companies that used employees that are well trained, not just subcontractors to put together your sunroom. The last thing you need is a sunroom that has not been put together correctly or you may have a problem.

Be Sure the Sunroom Meets Building Codes

It is also important to make sure that your sunroom is going to meet the building codes in your area as well. It doesn’t matter what state you live in, but you will need to make sure that your sunroom is going to at least meet the codes, and exceeding them is even better. Also, you should be able to get a permit for the structure and it should pass your inspection as well. This is so important, especially if you live in areas that get nasty storms.

Avoid Short Warranties

If you are consider companies for your sunroom, then you’ll want to make sure that you avoid the ones that only offer warranties that last a short time. Make sure that you find companies that are going to stand behind their products for years. You never know when you are going to have a problem, and having a long warranty is very important.

Look for Companies that Offer Various Options

You’ll also want to look for companies that are going to provide you with a variety of different options when it comes to styles. You should be able to choose from various styles for your sunroom, including glass ones, year round options, and some sunrooms that are only designed for three seasons. You’ll need to be sure that they have options that are going to look great with your home too.

Be the first to comment - What do you think?
Posted by Builder - May 17, 2012 at 10:56 pm

Categories: Uncategorized   Tags: , ,

How to Design and Build a Garage

In this article, I’ll give you four basic tips on how to design and build a garage. Building a garage is a challenging task, but you can do it if you take it step by step.

1. Check Building Codes and Obtain Permits

As with any major project, the first thing you want to do is to check the local building codes in your area and obtain any required permits before you begin construction. Usually you’ll need to document a set of garage plans as well as a plan that indicates the location of the garage on your land. Your local municipality will tell you exactly what you need.

2. Measure Out the Garage Site

Measure out the area on which you plan on building your garage. Make sure that you have enough area to support the design indicated on your set of garage plans. Plan on allowing at least 20 feet in length from back to front and 11 feet 6 inches in width for a single-car garage. Allow at least 18 feet 3 inches for a 2-car garage. Allow for even more length if you plan on adding extra space for storage or a work area.

3. Choose Design and Functionality

Plan in advance all of the elements and functionality you desire for your garage. Think about what you want to use it for now, and what you might want to use it for in the future. Err to the side of allowing for more storage space than you think you need, and consider the advantages of a 2-car garage if you have enough space to build one. There are plans and designs for any type of garage you may want to build, so choose one that matches or compliments your house in order to boost your property value.

4. Estimate Costs

A detailed set of plans should give you a complete material list, which will help you to estimate material costs. Then you’ll need to secure estimates from subcontractors for any work you plan on subbing out, such as foundation pouring, electrical, plumbing, and garage door installation. If you’re planning to hire a contractor to do most or all of the work, use your set of plans to establish the material cost up front and consider supplying the materials on your own in order to avoid any extraneous surcharges from your contractor.

Be the first to comment - What do you think?
Posted by Builder - May 17, 2012 at 7:12 pm

Categories: Uncategorized   Tags: , ,

Cost to Build – Five Benefits of Adding Architectural Services to Home Building & Remodeling Costs

Let’s be real here. No one likes to add costs to an already expensive proposition. And home building and remodeling can certainly get expensive.

 

But a closer look at an all-to-often overlooked professional service should shed some light on the subject and make the 2 – 5% extra expenditure worth it for you. Architects and residential designers add more than just preparing plans.

 

A LocalBuilding Authority Requirement?

 

In many real estate markets, the local building department will require the use of a locally licensed architect, residential designer, or at least a structural engineer. So, before you buy any house plans or design your own, be sure to check this out. I’ve run across a lot of instances where people have spent money or time preparing plans just to find out they are useless.

 

There are some good reasons why your building authority would have this requirement. Perhaps you are in a hurricane or other wind-load area. Seismic considerations are big in some areas. Using locally trained and licensed architects makes it easier for the building authority to monitor and achieve compliance.

 

Five Personal Benefits of Having Plans Professionally Prepared

 

Whether building from scratch or adding on to your home, there are some valuable benefits I’d like you to be aware of before you forge ahead. A good home designer can save you money, time, and headaches.

 

Consider the following advantages:

 

1) Aids in Planning & Preparations.

 

Working closely with your architect requires that many decisions are made early in the preparation stages. Design and structural issues are not left to the contractors or left to interpretation later on. This is very liberating for you! It avoids unwanted issues during construction.

 

2) Complies With Building Codes.

 

Many home owner builders dread the thought of complying with code requirements. Using these professionals will minimize or eliminate the fear of long delays in trying to get your plans approved. You can focus on more important things … like what you want!

 

3) Identifies Materials Choices Early.

 

Hundreds of materials choices can be involved when building a home. Putting off these choices till later can be confusing as well as budget busters. The architect, when working closely with you, can help you make these choices early and put your mind at ease.

 

4) Provides Unique Customization.

 

Do you want your home to be unique? Of course. Experienced home designers can provide this uniqueness while complying with codes and the requirements of Home Owners Associations. And they are also especially useful in helping you match any new additions to your existing home in your remodel.

 

5) Allows for Use of HomeBuilding Coach.

 

A surprising benefit of using an architect is the fact that many people may not need a General Contractor. Architects can often act as your home building coach especially if they have trade contractor connections. Whether you use your architect as your coach or another building professional, the fact remains that a good architect will help you prepare far better than you otherwise could without one.

 

Saving Money & Reducing Stress

 

Ultimately, the biggest benefit could be that using an architect could end up being a money saver rather than an extra expense. Avoiding delays during construction, solving problems before they arise, and reducing stress all add up to compelling reasons to seek out a good home designer for your project.

Be the first to comment - What do you think?
Posted by Builder - May 17, 2012 at 2:25 pm

Categories: Uncategorized   Tags: , , , , , , ,

Important Issues For New Storage Buildings

If you are like many people, the fact that your stuff seems to continually be stacking up can make you feel somewhat out of control. The reality is that in suburban American, garages are filled to capacity and overflowing with excess stuff. That is where independent Storage Buildings can help. Not the old broken down sheds of your childhood, but new and modern storage buildings that can hold up to the elements and the weather far greater than a lightweight, thin gauged metal shed. These sturdy and solid storage units are a great alternative for a cluttered and over stuffed garage.

One of the best things about this form of storage unit is that while it is strong enough and spacious enough for your needs, you can also put it up all by yourself if you are so inclined. The packages include detailed instructions and plans, and can be kept portable or made permanent. The truth is that putting these storage units up are not that hard to self build for the average residential home owner, and usually in the course of a weekend, you can put together your new storage unit.

However, if you are considering one of these storage units you will want to check your local homeowners association or the local building codes. There are often times when there are some prohibitive building codes and by laws of a homeowner’s association charter that can restrict and sometimes disallow the construction of certain Storage Buildings. It would be rather unfortunate if you spent the time, the money and the effort to put up a new storage unit only to find out that you are not allowed by either local building codes or your homeowners association rules.

Modern storage units can offer a wide variety of things for the owner. They can look nice, survive the harsh outdoor elements, and they can provide much needed space for a person or family that has nowhere else to put their extra stuff. They come in vinyl, wood, or metal kits, they can be garages or garden sheds, they can be small or large, made of surplus materials or high grade US steel. They are easy to set up and they come in a wide variety of sizes, styles and colors. Whether you need an extra place for your lawn care gear, a car you are working on, a boat, or just extra stuff, these storage units offer a person a safe and secure place to put it all.

Be the first to comment - What do you think?
Posted by Builder - May 17, 2012 at 10:03 am

Categories: Uncategorized   Tags: , , ,

Building Sheds – Essentials on Location, Shed Plans and Materials

Building sheds is a great way to add useful space without having to add another floor or altering the size of your house. They can be used as a work station or a recreational area for the family. Traditionally, a shed is used for storing tools, equipment, and other things that don’t need be stored inside the house. Building it may seem to be difficult, but there are many ways to make the task easier.

There is always an option to purchase a pre-made shed kit if you feel you don’t have the skills or time to do it yourself. But if you are the DIY type and would want to build one by yourself, here are some things that you need to consider.

Location

When building a shed, determine first what you plan to use it for. It can be used for storage, gardening, or as an extension of your house. It’s important to know the intended use so you can decide on the size and type of materials to use.

The location of your shed is very important factor that you need to consider. Carefully plan it according to the following considerations:

1. Distance from your property line

2. Local building code in your area

3. Direction of sunlight

4. Connection to utility lines

Plans and Blueprints

Plans and blueprints are always needed when building sheds. Depending on what type you plan to build, you can buy plans from a contractor or at your local bookstore. The internet is also a great source for shed plans.

So, what constitutes a good shed plan? For starters, they should be easy to understand. Plans aimed for DIY woodworkers must be free of complicated, technical terms, and filled with drawings to better explain the process.

A good set of plans should also be detailed; complete with clear step-by-step instructions from creating a foundation to choosing the materials for the roof.

Foundation, Framing and Roofing Materials

When it comes to building the foundation, you can either make a concrete slab to build your shed on or you can dig the ground and fill it with gravel. Refer to your plans’ measurement in building the frame for your shed. If you want it to be made of renewable resources, use wood as your frame material. Cedar is the ideal type of wood; it’s light, permeable and maintains its size and shape despite daily wear and tear.

You also have the option to use vinyl framing. Although more expensive than wood, vinyl is most likely to adhere to building codes in the area and does not need painting. However, vinyl-sided sheds are not considered eco-friendly.

When choosing the material for the roof, you can choose from cedar, corrugated metal, plastic, slate shingles or clay tiles. Slate shingles or clay tiles are heavy so make sure that your structure is sturdy enough to support this type of material. Roof ridge pieces cannot be disregarded when building the roof of your shed as they keep precipitation from leaking through the apex of the roof.

Another way to make your shed last for good many years is to paint or stain it. You can use caulk for more protection from humidity and other elements that are harmful to your shed.

Building a shed has many benefits; it provides additional storage, allows for an extension of family space, and for those who enjoy DIY projects, it gives a sense of fulfillment for finishing a project using both brains and brawn.

Be the first to comment - What do you think?
Posted by Builder - May 17, 2012 at 6:04 am

Categories: Uncategorized   Tags: , , , , ,

Next Page »